Deprecated: Function ereg_replace() is deprecated in /home/content/27/12590927/html/libraries/Trash.php on line 96
Baylor Ballpark - Sports Field Solutions

Services

Construction &
Renovation

Materials

Diamond Pro Distributors

Cultural Practices

SFS Completely Renovates Baylor Ballpark

Following a prolific 2012 season in which Baylor put up 50 wins, the Bears decided to make some drastic changes at Baylor Ballpark.    

 

After years of band-aid renovations, poor drainage and an antiquated irrigation system, it was time to renovate the ballpark. When that decision was made, Baylor called Sports Field Solutions. 

 

The task was monumental, too say the least. Hundreds of truckloads of existing soil was replaced with a sub grade drainage system, pea gravel and more than 10 inches of sand.  The field was laser leveled and sodded with Certified Tifway 419. Also, an artificial halo was added behind home plate, which helps with sunlight and traffic issues during batting practice.

 

Perhaps most impressive was the timeliness as the entire project took only about 8 weeks.

 

 

 

PHOTO GALLERY: Baylor Ballpark